AL‐QUSIDAT‐ SHA'AM ROAD PHASE (2) UPGRADING AND IMPROVEMENT - Abu Dhabi ‐ UAE

The road consists of a dual carriageway with three lanes in each direction with parallel side roads parking and sidewalks on each side. The road is heavily used by trucks traffic and light vehicles and congested in most times due to intersections and the truck percentage of traffic using the road. The road is bounded by Qusidat RIA and the town of Shammel with the approximate length of 9 km. the corridor is considered to by commercial and residential.

Services Undertaken: The Design phase in divided by 6 Stages :

1. Preliminary study

  • Survey Works
  • Geotechnical and Subsoil Conditions
  • Pavement Conditions
  • Traffic Surveys and Forecast: Traffic counts and O-D surveys - Traffic projections (2015, 2020, 2030)
  • Life Cycle Costs Analysis
  • Reports and Presentations

2. Preliminary design

  • Layout Plans
  • Survey Works
  • Services Plans
  • Geotechnical Investigations
  • Expropriation Plans
  • Road Marking and Signage Plans
  • Cross Sections
  • Standard Cross Sections
  • Longitudinal Sections
  • Storm Water Drainage
  • Structures, Bridges and Tunnel Design
  • Diversions
  • Tender documents

3.  Final design & Tender Documents

 4. Tender Document Preparation

 5. Tender Evaluation

 6.  Contract Documentation

 7. Construction Supervision