BEIRUT CENTRAL DISTRICT INFRASTRUCTURE WORKS - Beirut Central District, Lebanon

The works are related to Beirut Central District – Infrastructure – Phase 1. These works included the rehabilitation and/or reconstruction of roads, bridges and tunnels with all services Waste Water, Storm Water, Electricity, Water Supply, Irrigation, Telephone and Street Lighting Networks.

Services undertaken include:

  • Detailed Design and Shop Drawings for Tunnels Stone Cladding.
  • Review of Crosshead design of Columns of New Fouad Chehab Viaduct at Bechara El-Khoury and preparation of modification recommendations.
  • Design and Method Statement for the Removal of Portion of Existing Fouad Chehab Bridge Deck at Bechara El-Khoury.
  • Method Statement for the Demolition of Existing Ghalghoul Interchange of Fouad Chehab Bridge.
  • Design and Method Statement for the Inspection, Repair and Maintenance of Existing Fouad Chehab Bridge over Bechara El-Khoury including Detailed Methodology and Analysis for Load Testing of Bridge Deck.