Re-building of the 35,000m² facility that included land reclaimed from the sea introducing new safety requirements. The plan was reviewed and approved by Foster Wheeler France. Work included:

  • Infrastructure network including roads, sewer and drainage systems and pipeways
  • 120m long breakwater
  • Construction of 13 welded steel oil tanks with a total storage capacity of approx. 54,000m³
  • Installation of 16 LPG steel tanks having a total storage capacity of 3,000m³
  • Construction of a 500m² LPG automatic bottling plant (covered)
  • Construction of an 1,000m² lube oil blending plant
  • Construction of a 600m² loading rack capable of receiving 6 road tankers
  • Retention walls and boundary walls

Services undertaken include: Preparation of Master Plans, Detailed Designs, Working Drawings, Fabrication Drawings followed by Project Control and Construction Supervision.