RECONSTRUCTION OF OIL DEPOTS AND GAS INSTALLATIONS IN THE DORA AREA, MEDCO
Re-building of the 35,000m² facility that included land reclaimed from the sea introducing new safety requirements. The plan was reviewed and approved by Foster Wheeler France. Work included:
Services undertaken include: Preparation of Master Plans, Detailed Designs, Working Drawings, Fabrication Drawings followed by Project Control and Construction Supervision.