RECONSTRUCTION OF OIL DEPOTS AND GAS INSTALLATIONS IN THE DORA AREA, UNITERMINALS
Reconstruction and Extension of the facility (approx. 17,000m²), land reclaimed from the sea (approx. 9,000m²) and to introduce safety requirements. The plan was reviewed and approved by Foster Wheeler France. Work included:
Services undertaken include Preparation of Master Plans, Detailed Designs, Working Drawings, Fabrication Drawings, Project Control and Construction Supervision.