GAS DEPOTS AND GAS INSTALLATIONS IN THE DORA AREA, GAZ ORIENT - Lebanon

Reconstruction and Extension of the facility (approx. 10,000m²), additional land reclaimed from the sea (approx. 13,000m²).

  • Infrastructure network including roads, sewer, drainage system and pipeways (and pipe racks).
  • Protective works to the land reclamation area (approx. 300m of Breakwater).
  • Construction of reinforced concrete walls to retain embankment around the 10 x 3,500m³ mounded LPG tanks.
  • Installation of 1000m multiple sea-line, 2x10"+6" in depths of 27m with Pipe Line end Manifold (PLEM) and flexible hoses at the sea end.
  • Installation of a multiple buoy mooring for 56,000 DWT Vessels in 27m depths.
  • Construction of a new 400m² Loading Rack - 100m² Pump Room.
  • Construction of reinforced concrete bases for 4 generators and 2 embedded steel fuel tanks.
  • Construction of a 2 floor Control Building (Built up area approx. 500m²).
  • Construction of 2 welded steel water tanks for fire fighting 12m diameter and 18m in height with a total storage capacity of 4000m³.
  • Reinforced Concrete and Blockwork boundary walls.

Services undertaken include Preparation of Master Plans, Detailed Designs, Working Drawings, Fabrication Drawings, Project Control and Construction Supervision.