The project is made up of several Faculties, Dormitories and Technical Buildings on a 700,000m² plot of land and the necessary Roads and Infrastructure Network.
Services Undertaken include Roads (10km), Wastewater and Storm Water Network (25km), work included Detailed Design and Preparation of Execution Drawings. The following structures: Underground Reservoir, Technical Building, Steel Structures and Underground Parking, work included Preparation of Architectural and Structural Detailed Designs and Execution Drawings including Bar Bending Schedules and Calculations for Reinforced Concrete Buildings and Structural Steel Works.