Work for Rehabilitation and Development of the Beirut-Tripoli Motorway between Nahr El-Mott and Dbayeh comprised full rehabilitation including the installation of surface water drainage multitubular ducts for telephones including chambers, main and secondary sewage for the Sahel El Metn including a sewage lift station and main electrical cabling for the area. A multitude of services have been diverted and or replaced with new installations.
Services Undertaken included Construction Supervision and Project Control. Work also included finalizing Traffic Designs and Interchanges Designs in the Project Area.