The project is part of the Beirut South Entrance project. It consists of the construction of multi-span prestressed post-tension concrete bridge of 2 x 3 lanes dual carriageways, 430m long with ramps and 30m wide.
Services Undertaken included Preparation of Detailed Designs, Tender Documents and Cost Estimates including:
Drawings and Tender Documents followed by Project Control and Construction Supervision.