SAEB SALAM TUNNEL - Beirut, Lebanon

The project is part of the Beirut South Entrance project. It consists of the construction of tunnel 2 x 2 lanes dual carriageways, 800 m long with ramps and 18 m wide.

Services Undertaken included Preparation of Detailed Designs, Tender Documents and Cost Estimates including:

  • Traffic
  • Drainage
  • Main Sewers
  • Electrical Cabling
  • Telephone

Drawings and Tender Documents followed by project control and construction supervision.