The project is part of the Beirut South Entrance project. It consists of the construction of tunnel 2 x 3 lanes dual carriageways, 140 m long with ramps and 30 m wide.
Services Undertaken included Preparation of Detailed Designs, Tender Documents and Cost Estimates including:
Drawings and Tender Documents followed by project control and construction supervision.