Construction of a 70m high dam for the storage of about 80 Million m³.
Services Undertaken included Preparation of Preliminary and feasibility studies followed by detailed designs and tender documents for the dam and storage reservoir. Studies include topographic surveys, geological and hydro geological studies, geotechnical investigations, hydrological studies, environmental impact assessment, economic feasibility studies and water usage master plans (both water and irrigation). Detailed designs include structural and seismic studies of the dam and ancillary structures, study of the storage reservoirs and preparation of land acquisition documents. Work carried out in collaboration with Gibb Ltd. (now part of Jacobs)