The Project consists of the construction of a Wastewater Treatment Plant in Manama Bahrain. The Plant is designed in conformance with the Recommended Standards for Wastewater Facilities. The Treatment Plant is sized for a design flow of 125 m³/day and a peak daily flow of 312.5 m³/day. The BOD loading is anticipated to be 27.2 kg/day. The Treatment Plant Design conforms to UFC 3-310-04 Seismic Design for Buildings and Sections 134800 Seismic Protection for Miscellaneous Equipment and 134800.00 10 Seismic Protection for Mechanical Equipment.
Services Undertaken include