UNITERMINALS – MARINE WORKS - Beirut, Lebanon

RECONSTRUCTION OF OIL DEPOTS AND GAS INSTALLATIONS IN THE DORA AREA, UNITERMINALS 

Reconstruction and Extension of the facility (approx. 17,000m²), land reclaimed from the sea (approx. 9,000m²) and to introduce safety requirements. The plan was reviewed and approved by Foster Wheeler France.

Work included:

  • Protective works to the land reclamation area (approx. 100m of breakwater)
  • Installation of a 1600m sea-line, 10" to depths of 14m with flexible hose
  • Installation of a 800m sea-line, 6" with flexible hose
  • Installation of a multiple buoy mooring for 30,000 DWT vessels in 14m depths
  • Construction of a new 150m2 loading rack on land reclaimed from the sea

Services undertaken include Marine Surveys and Studies, Detailed Designs, Working Drawings, Fabrication Drawings followed by Project Control and Construction Supervision.