MEDCO – MARINE WORKS - Beirut, Lebanon

RECONSTRUCTION OF OIL DEPOTS AND GAS INSTALLATIONS IN THE DORA AREA, MEDCO 

Re-building of the 35,000m² facility that included land reclaimed from the sea introducing new safety requirements 120 m long breakwater.

Services undertaken include Marine Surveys and Studies, Detailed Designs, Working Drawings, Fabrication Drawings followed by Project Control and Construction Supervision.