The Project consists of Supervision of Construction of Additional Sewers And Potable Water Distribution Lines And Their House Connections in the following Localities: Tel El Abiad, Douris, Iaat, Nahle, Younine, Taybeh, Ansar, Majdaloun, Haouch Barada, Haouch Tel Safiya, Britel, Hour Taala, Talia Hammoudieh, Hezzine, Ham, Maaraboun and Tfail.
The construction of some 70 km of sewer lines ranging in diameter from 150 mm to 800 mm and some 45 km of HDPE potable water pipes and 6 km of ductile potable water pipes and 5915 water service connections to be implemented within a time period of 18 months.
Services Undertaken include: