Construction of Sections of the Main Sahel El-Metn Sewerage Network.
Services Undertaken include:
During the rehabilitation of the Nahr El-Mott - Antelias motorway and the area of Dbayeh, we were responsible for Project Control and Supervision of the Installation of the Sahel El Metn Main Sewer Line in the areas where the motorway was widened. Our Brief included for the Modification of Designs as required. The large diameter pipe, over 1m in diameter was installed under our Supervision below the level of the water table and required special excavation methods and the installation of manholes made up of precast elements.
Project Control, Design Review and Construction Supervision.