The project comprises the extension of the sewage network and related works in Saida and surrounding communities. Sewage collected will be conveyed to the Wastewater Treatment Plant which was designed on the Saida Coastal Area (Phase 1). The project includes the design of approximately 130 Km of local collection sewer system and main interceptor sewers.
The works were carried out in association with Noppon Jigesuido Sekkei Co. (NJS).
The Project was Funded by the Japan Bank of International Cooperation (JBIC).
Services Undertaken include:
Preparation of Documentation for Land Acquisition, Preparation of Detailed Designs and Contract Documents including all Topographical Surveys, Soil Investigation, and all Civil, Electrical, Mechanical Design Services and Cost Estimates.