The Deir Ezzor – Bokamal road is considered one of the major road networks connecting the Syrian ports with the western Iraqi border.
The project includes the construction of the road starting at Al-Mayadin roundabout and extends toward Al-Bokamal town till the intersection with Al Hery town. The total length of the proposed main road is about 90km. In addition, four road links with a total length of 28Km will connect the residential communities and the main towns along the proposed Deir Ezzor – Al Bokamal road.
Services Undertaken included
The project consists of the following activities as indicated below: