The Ministry of Energy and Water and the EDZ signed a memorandum to build a privately owned 60 Megawatt engine-driven power plant in Zahleh. This power plant will operate on heavy fuel oil (HFO) and later on natural gas (NG). The plant will mainly consist of:
The proposed engine-driven power plant will be comprised of 7 power units generators and 1 stand-by generator, with one stack emission for every four generators.
Services undertaken include:
Preparation of an Environmental Scoping Report – Phase I, that includes the following: