Rehabilitation of certain parts of the lower floors and basements to this important Commercial Center, in Beirut Central District, that were gutted by fire in the period 1975-1976.
Services undertaken include Preparation of a Report about the safety of the building, Detailed Designs and Drawings to bring the building back to a structurally sound condition.