REHABILITATION AND EXTENSION OF ABLAH – BEIT CHAMA AND ALI NAHRI – FAOUR ROAD - Bekaa, Lebanon

Rehabilitation and extension of Ablah – Beit Chama Primary Road (9 Km long) and Ali Nahri – Faour secondary road (16 Km long). The works include:

  • Construction of specified strips of road consisting of removal of the existing pavement and reconstruction of a new pavement including sub-grade preparation; laying of sub-base and aggregate base course layers along with asphalt base and wearing courses.
  • Road overlay of specified strips of road consisting of the removal of the existing asphalt layers by milling and re-asphalting and wearing coats.
  • The construction of a drainage system including closed and open concrete channels on both sides of the road as well as the necessary culverts crossing the width of the road.
  • The execution of retaining walls at cut and fill sections and where needed.
  • Relocation of existing utilities including electric and telephone poles.

In General, Representation of the owner on site and the pursuit of the owner’s interests vis-à-vis the different construction players. In Particular, Site supervision and engineering support including:

  • Assuring that the works are executed in conformity with the tender documents, relevant codes and the rules of the art.
  • Assistance in problem solving of unforeseen conditions which may arise during the execution of the works and which may need partial redesign of the works.
  • Monitoring the program of works presented by the contractor to assure timely completion of the project.
  • Performing quantity take-offs of the executed works and the preparation of the interim and final payment certificates as well as comparative quantity scheduling in case of quantity overruns.